Sample Models

Model 2.72: ANP BOCR - Post-Pandemic Work Scheduling at a Pittsburgh-Based Engineering Office (2020)

Short Description

The purpose of this project is to predict what the “new normal” work schedule should look like for the R&D workforce at a Pittsburgh metro-based organization. Using a BOCR ANP framework and the perspective of the director of engineering, four alternative work arrangements are evaluated: a full return to the office, a 50/50 hybrid schedule with mandated days, a 50/50 hybrid schedule with flexible days, and a fully flexible schedule. The results suggest that the best short-term and long-term results may be different, opening an interesting discussion for R&D leadership on the future of work and implications for organizational cultural norms.

In order to get access to the Model files you have to be registered and logged in.

SSL Certificates